Second job - Reinstallation of mounting frame (skid) with epoxy grout and localized epoxy injections for reaffirmation of the existing grout. - Apoltec
1234
post-template-default,single,single-post,postid-1234,single-format-standard,ajax_fade,page_not_loaded,,qode-title-hidden,footer_responsive_adv,qode-content-sidebar-responsive,qode-child-theme-ver-1.0.0,qode-theme-ver-10.1.1,wpb-js-composer js-comp-ver-5.0.1,vc_responsive

GROUTING AND MACHINERY
FOUNDATION REPAIR SOLUTIONS

Second job – Reinstallation of mounting frame (skid) with epoxy grout and localized epoxy injections for reaffirmation of the existing grout.

Date

September 2016

Country

Netherlands

Industry

Chemical

Machinery

NEA booster compressor

Working time

5 days

Work type

Reinstallation of mounting frame (skid) with epoxy grout and localized epoxy injections for reaffirmation of the existing grout.

Comments

Estimated working time: 9 days – Actual working time: 5 days. As proof that we gained the confidence of our customer, we were invited to perform a second project at their plant. They showed very satisfied with our working methods and quality of work as in the former project.