Third job - Complete reinstallation: anchor bolt repair and replacement, and regrouting with epoxy grout. - Apoltec
1233
post-template-default,single,single-post,postid-1233,single-format-standard,ajax_fade,page_not_loaded,,qode-title-hidden,footer_responsive_adv,qode-content-sidebar-responsive,qode-child-theme-ver-1.0.0,qode-theme-ver-10.1.1,wpb-js-composer js-comp-ver-5.0.1,vc_responsive

GROUTING AND MACHINERY
FOUNDATION REPAIR SOLUTIONS

Third job – Complete reinstallation: anchor bolt repair and replacement, and regrouting with epoxy grout.

Date

August 2016

Country

Belgium

Industry

Steel

Machinery

Steel rolling benches SACK

Working time

13 days

Work type

Complete reinstallation: anchor bolt repair and replacement, and regrouting with epoxy grout.

Comments

Estimated working time: 15 days – Actual working time: 13 days. Second project at this steel plant as a proof that we gained the confidence of our customer during our first intervention. They were very satisfied with our working methods and quality of work as in the former project.